The Federal Government has allocated a total of ₦10.61 billion for the overhaul of engines on the Gulfstream G550 aircraft assigned to Vice President Kashim Shettima between 2024 and 2026, according to an analysis of federal appropriation bills.
The aircraft, registered as 5N-FGW, accounted for the largest share of engine maintenance spending within the Presidential Air Fleet (PAF) under the Bola Tinubu administration, representing about 55 per cent of the ₦19.27 billion earmarked for engine overhauls across the fleet during the three-year period.
Budget documents obtained and reviewed by Zebra News show that funding for the vice president’s aircraft rose sharply over the period, increasing from ₦1.24 billion in 2024 to ₦5.51 billion in 2025 — a 345 per cent jump — before declining to ₦3.86 billion in 2026.
In the 2024 Appropriation Act, the project was listed under code ERGP31206170 as “Overhaul of 5N-FGW Engines” with a “NEW” status. By 2025, the project was reclassified as “ONGOING,” while the allocation surged to ₦5.51 billion. The “ONGOING” status was retained in 2026, despite a reduced allocation.
The Gulfstream G550, now about 13 years old, operates under the call sign “Nigerian Air Force 2” when conveying the vice president. The aircraft has experienced repeated technical issues that have disrupted official travel.
In May 2024, Vice President Shettima aborted a trip to the United States for the US–Africa Business Summit in Dallas after the aircraft developed a fault mid-flight. The incident came weeks after President Bola Tinubu was forced to charter a private jet to Saudi Arabia when the same aircraft suffered an oxygen leak while in the Netherlands.
Four months later, in October 2024, Shettima again cancelled an international trip — this time to the Commonwealth Heads of Government Meeting in Samoa — after a foreign object struck the aircraft during a stopover at New York’s JFK Airport.
Presidency officials, who spoke on condition of anonymity, said the repeated incidents may have necessitated urgent and extensive maintenance, contributing to the rising budgetary provisions.
Beyond the vice president’s aircraft, the federal government also allocated ₦6.98 billion between 2024 and 2026 for the overhaul of engines on two Falcon 7X jets, registered as 5N-FGV and 5N-FGU. The aircraft received ₦1.66 billion in 2024, ₦3.13 billion in 2025 and ₦2.19 billion in 2026.
Another Gulfstream jet, registered as 5N-FGS, received ₦1.68 billion for engine overhaul in 2024, with no subsequent allocations recorded in the following years.
Overall, engine overhaul expenditure across the Presidential Air Fleet stood at ₦4.58 billion in 2024, rose to ₦8.65 billion in 2025, and declined to ₦6.05 billion in 2026, bringing the total to ₦19.27 billion.
Notably, engine maintenance spending peaked in 2025, a year after the Presidency took delivery of a ₦150 billion Airbus A330. At the time, the President’s spokesman, Bayo Onanuga, said the acquisition would save Nigeria “huge maintenance and fuel costs, running into millions of dollars yearly.”
While engine overhaul spending for older aircraft fell by about 30 per cent in 2026, routine aircraft maintenance allocations under line item 22020407 increased by 10 per cent, rising from ₦4.12 billion in 2025 to ₦4.54 billion in 2026.
Aviation experts say the age of aircraft plays a major role in escalating maintenance costs.
“These aircraft are not new. The older the aircraft, the higher the cost of maintenance and operation,” said Olumide Ohunayo, General Secretary of the Aviation Round Table. He noted that the Gulfstream G550’s age means critical components, particularly engines, now require more frequent and expensive overhauls.
An aircraft maintenance engineer, who requested anonymity, said engine overhauls are mandatory at fixed intervals regardless of usage.
“For a jet like the G550, a complete engine overhaul can cost between $1.5 million and $3 million per engine, depending on the condition,” the engineer said. “Rising costs may indicate replacement of major components or deferred maintenance that now requires catch-up work.”
John Ojikutu, Chief Executive Officer of Centurion Security Limited, added that the figures likely include more than basic engine repairs, pointing to associated logistics and compliance costs.
The Presidential Air Fleet, operated by the Nigerian Air Force and based at the Presidential Wing of the Nnamdi Azikiwe International Airport in Abuja, currently consists of 10 aircraft — six fixed-wing jets and four helicopters.
Critics have long argued that Nigeria’s presidential fleet is among the largest and most expensive in Africa, particularly for a country facing acute fiscal pressures.
Debo Adeniran, Executive Chairman of the Centre for Anti-Corruption and Open Leadership, described the spending pattern as inconsistent with public expectations.
“We thought we would have an administration that would be frugal in spending,” he said. “Instead, what we are seeing is profligacy in the midst of widespread poverty.”
In 2024, the House of Representatives Committee on National Security and Intelligence recommended the procurement of new aircraft for both the president and vice president, citing safety concerns and rising maintenance costs. While the president subsequently received a new Airbus A330, no replacement has been announced for the vice president’s aircraft.
At the time of filing this report, the Presidency had not responded to enquiries on the specific scope of the engine overhaul work carried out on the vice president’s aircraft.
Budget records also show continued investment in PAF infrastructure, including ₦714.8 million allocated for the construction of a hangar in 2025, which fell to ₦500.36 million in 2026.
Overall, the Presidential Air Fleet’s total allocation declined from ₦17.32 billion in 2025 to ₦14.70 billion in 2026, largely due to reduced capital expenditure.

